Installation method of square tube polishing machine:
This machine is manufactured in two sections. During installation, draw straight lines using the marking points 1, 2, 3, and 4 as reference points to fix the center line of the machine. Use the four corners of the machine as reference points to level and align, and then the machine can be fixed. The rubber wheels of the upper and lower material feeding frames are parallel to the horizontal guide rubber wheels of the machine, and then the machine can be fixed.
|
ltem parameter |
wheel head main power(kw) |
Total power (kw) |
Diameter of grinding head spindle(mm) |
Throws the tube scope |
Speed polishing(m/min) |
Main engine size(mm) (AxB) |
|
8 Wheel head in pipe polisher (BG-11 ) |
4kw×8 |
29.5kw |
0-20 |
|||
|
10 Wheel head in pipe polisher (BG-12) |
4kw×10 |
45.5kw |
Φ36 |
0-20 |
7000×1300 |
|
|
10 Wheel head in pipe polisher (BG-13 ) |
4kw×10 |
60.5kw |
Φ36 |
0-18 |
7200×1550 |
|
|
10VVheel head in pipe polisher (BG-14 ) |
4kw×10 |
82.5kw |
Φ36 |
Φ76-Φ219 |
0-15 |
|
|
Group 32 of the tube polisher (BG-15 ) |
4kw×32 |
133.5kw |
Φ36 |
4-35 |
17000×1500 |
|
|
Group 28 of the tube polisher (BG-16) |
117.5kw |
Φ36 |
4-35 |
10500×1500 |